ABOUT THIS PROJECT:

The 201A Fuel Station Fueling station in Fort McMurray Alberta was an expansion project by Syncrude Canada Ltd. to add an on-site fueling solution (Gasoline & Diesel) to store and dispense fuel for operations. Enginuity provided the general contractor on the project, P.D. McLaren Ltd., Enginuity with third party review of project such as contract documents, plans, and designs along with QA/QC for the project. Additionallty Enginuity performed the compilation and submission of close-out documentation on the project. The close-out documentation included: an operations and maintenance manual for the fuel station, overview drawings of the fuel station layout, ‘as-builts’, manufacturing and installation reports and certifications for structural, mechanical, and electrical aspects of the project, and major component specifications and OEM details.

Enginuity’s responsibilities included:

  • Project Management
  • QA/QC and third party verification
  • ‘As-built’ drawing production
  • Close-out documentation
  • Production of Operations & Maintenance Manual

Client:

P. D. McLaren Limited

Project Category:

Inspections & Audits

Purpose

Capacity
Compliance