660 TONS BARGE CONVEYOR BRIDGE

ABOUT THE PROJECT

A new barge loading tilting conveyor bridge, loading 660 pellets per hour (660 tons/day) of finished product.

Enginuity provided planning and feasibility, detail design, project management, and site support services on the Conveyor Bridge. The design was executed to allow for minimal downtime and integration of the conveyor bridge into the existing operations with minimal disruption.

SERVICES RENDERED TO CLIENT:

  • Project scoping and planning
  • Structural Engineering
  • Mechanical Engineering
  • Tendering and Procurement
  • Field engineering services
  • Contractor Management
  • Registration and permitting

Client:

Skretting Canada

Sector:

Industrial

Purpose

Capacity
Safety