ABOUT THE PROJECT
To support an existing mining expansion project, new operational and process facilities were needed in short timeframes. Enginuity provided multidisciplinary engineering for a new Fleet Maintenance / Tire Pad Facility for light, medium vehicles as well as heavy duty haul-trucks. The Maintenance / Tire Pad Facility was on the critical path for the remainder of the project and was heavily driven by a tight design and construction schedule. This involved significant interaction and coordination between Enginuity, the Contractor, Pre-Engineered Building Supplier and the Client.
Services Rendered:
- Re-evaluation and Refinement of Design Basis Reports
- Conceptual Designs & Interface with Pre-Engineered Building Provider
- Multidisciplinary Engineering Consultation & Design:
- Site Plan & Equipment General Arrangements
- Civil Site Prep & Utility Delivery
- Radiant Foundation & Slab Design
- High-Bay Thermal Design Considerations
- Mechanical Systems, Ventilation, Domestic Plumbing, Vehicle Washdown, Compressed Air,
- Design to FM Global Standards
- Temporary Utilities Tanks, Pumps, & Piping Systems Design – potable water, utility water, fire protection water, sanitary/sewage
- Electrical Vehicle Charging for both Light and Heavy Trucks
- Sub-Station Connection – no natural gas on site
- Site Visits & Engineering Field Reviews
- Construction Support, Value Engineering from Design Basis Memorandum

Client:
Teck