MOLSON’S PLANT PIPING

ABOUT THE PROJECT

Molson Coors had been planning a new facility on the Lower Mainland in BC.  They began construction of the new facility in Chilliwack, BC relocating operations from Vancouver.  The major prime contractor (SBW) invited Enginuity to supply all designs for support of the piping networks throughout the plant.  EC supplied all designs for piping supports, trays, etc., from assessment and upgrades to the main building structure, through to design of all supports and connections to the plant process and utility piping trespassing within several battery limits including fermentation and bottling plants. Enginuity co-ordinated the design with various parties to meet both code and client requirements in a very condense environment. Designs were fully inclusive of all aspects including structural and seismic considerations.

SERVICES PROVIDED BY EC:

  • Concepts
  • Performance Specifications: flexibility and thermal and static stress analysis
  • Structural assessment and upgrade of existing
  • Seismic Design
  • Primary support structure design
  • Design of secondary pipe supports
  • Co-ordination with several design groups
  • Sight support and trades oversight
  • Engineering field reviews and inspections