Annacis Island WWTP – Stage 5 Expansion
ABOUT THE PROJECT
As part of Annacis Island recent Waste Water Treatment Plant Stage 5 Expansion Project, Enginuity was retained by Maple Reinders to design piping and liquid distribution systems for the Gravity Thickener Tanks. Working off Process design, Enginuity rendered Mechanical & Structural services for both above and underground piping systems. The work included design, and engineering of processing piping, inclusive of EoR services for piping thermal performance, seismic restraints, supports, and stress analysis.
Services Rendered:
- Client Consultation on BC design requirements/provisions
- Presenting case for value engineering to save on material and construction costs over original
- Thermal, Heat/Mass Balance, & Insulation design
- Routing of pipe in co-ordination with various parties
- Pipe stress & flexibility analysis
- Thermal Stress Design
- Fabrication, Construction, & Installation Specs
- Insulation & Pipe Fabrication Specs
- Design of Supports & Restraints
- Structural engineering and design of anchors & secondary support structures
- Pre-construction field verification & construction support
Client:
Maple Reinders
Sector:
Project Category:
Purpose
Capacity
Compliance